Building the second floor
June 13, 2016 We are up and going…we are four and a half months since we starting excavation. All the fancy arches and building of the Hot Tub delayed us a little but everything is running smoothly. Hot Tub in the… we don’t want to call it The “Spanish” court out of respect for the […]
Roof over First floor
May 25, 2016Wow, I can’t believe it had been seven weeks since my last post. The house detailing and Interiors are keeping me really busy.The Boveda ceilings (the exposed brick ceilings) are going in. It is a long, tedious process, as the brick is installed one by one and they form a flat arch […]